Item bank migration: import a decade of items without re-keying

Migrating an item bank? What to tidy first, how import with metadata, framework mapping and rubrics works, and why each item gets named-educator review.

Item bank migration should not mean re-keying a decade of items. On NUADU you import them with their metadata, framework mapping and rubric structure; a named educator then reviews each one at the same gate as a newly written item, and from that point it carries version history like any other. This post is for the exam officer and the IT or compliance lead planning the move: what an item bank is, what to tidy first, how the import works, and why the bank does not have to move in one piece.

What is an item bank?

An item bank is a managed collection of assessment items together with what is known about each one: who wrote it, what it assesses, at what level, against which rubric and framework, and how it has changed. In testing usage, "item pool" often means the narrower set drawn from a bank for a particular test or form. Migrating the bank with its metadata, framework mapping and rubric structure is what keeps that knowledge.

The bank is the part of an assessment programme that took longest to build and is hardest to replace. "We have a decade of items in the old system and nobody is typing them in again." Fair. NUADU treats import as a first-class path, not a fallback: the Create pillar's headline sets it between authoring by hand and AI drafting, as one of three routes, and the choice is yours. No AI is required for it.

Manual authoring and bank import are first-class paths.

What should you tidy before an item bank migration?

Tidy the bank at the source, before the move: import carries what you give it, so the state of your current bank decides how clean the move is. Five things deserve a decision each.

  • Metadata. Bulk upload maps metadata on the way in, so decide which fields matter — topic, level, author, date of last use — and make them consistent first.
  • Rubric structure. Items can be imported with their rubric structure. An item whose rubric lives in a separate spreadsheet arrives without it, so attach it before the move.
  • Framework mapping. Existing mappings import with the item. Any that were never formally confirmed can be confirmed at review, where an alignment stands only once a named educator approves it.
  • Duplicates. Where the old system holds near-identical copies of an item, choose the one that comes across, so its history starts from a single version.
  • Retired items. Decide what is retired before you move. The audit trail will version what you bring; it cannot version what you left behind.

None of this is specific to NUADU; any import rewards it. For the platform itself, the home page's figure is: "Your first full deployment takes 2–3 weeks." Deployment depends on integration with your LMS, SSO and learner records, so plan that figure with your IT lead; the review of imported items is planned separately, module by module.

How do you import a question bank into NUADU?

Import it from the existing bank or bulk-upload it with metadata mapping, then put every item through review. An imported item is not grandfathered in: every item that reaches a learner has been reviewed and approved by a named educator and aligned to your rubric and framework, whether it was written yesterday or a decade ago.

The reviewer works with the full set of tools — editing or rejecting items, confirming the alignment, adjusting criteria and weights — and the approval puts a name on the item. Plan that review as part of the migration, not as an afterthought: decide who reviews which module, and in what order, before the first file is uploaded. For a legacy bank this matters more than it sounds. The first time an old item is used on NUADU, somebody with a name has looked at it recently and said yes, which is exactly what an external reviewer asks about old items. From then on the item carries version history, a named approver and an audit record: the Create page's "audit-ready by default".

Items drafted with AI assistance on meet the identical gate; AI-drafted exam questions walks through that review. Once in the bank, objective formats are scored deterministically by rules you configure, while constructed and spoken responses are marked against the rubric and signed off by a marker — the line our post on objective vs subjective questions draws.

Do you have to move the whole bank at once?

No. In the words of the Create pillar's item bank FAQ, NUADU "can also act as a second home for items that live primarily in another system". The bank does not have to move in one piece, and it does not have to stop living where it lives today. Whatever you do bring is the bank the variants, the markers and the reports draw on.

Authoring, alignment and marking run in multiple languages, and translations are reviewed by named educators — not auto-published. One qualifier, in the Certification page's words: "Multilingual assessment is supported; language coverage, including for AI-assisted marking, is confirmed per deployment." Ask about your languages before you plan the move, not after.

The IT or compliance lead will ask three further things before any content moves: where it lives, who processes it and how long it is kept. The Trust page sets out data residency, the DPA and sub-processors, with retention configurable per data category. Identity and LMS plumbing — SSO, LTI integration, cohort import — is a separate conversation from the items themselves.

The short version for the exam officer: tidy the metadata, attach the rubrics, decide what is retired, and bring the rest. The platform will put a name on every item you keep.

→ Talk to us about your assessment workflow (30 min)